Tender Procurements and Contract Opportunities Indonesia

  • Decrease font size
  • Default font size
  • Increase font size
  • default color
  • red color
  • green color

Position

Home News Oil & Gas Total disbursed U.S. $ 4.21 Billion for New Projects Mahakam block
Total disbursed U.S. $ 4.21 Billion for New Projects Mahakam block PDF Print E-mail
Tuesday, 29 March 2011 08:50
Article Index
Total disbursed U.S. $ 4.21 Billion for New Projects Mahakam block
Page 2
All Pages
Aquatic mammal. Located on the bridge South Processing Unit (SPU) Camp Total E & P Indonesie PSC Mahakam, Kutai Kartanegara, East Kalimantan, Minister Darwin Zahedy Saleh inaugurated the construction of gas fields and condensate Tunu stages 11, 12, 13A, PECIKO Master Theses 6 and accommodation facilities field SPU Saturday (26/03/2011).

The inauguration was also attended Evita Legowo, Head of BP Migas R. Priyono, Vice Governor of East Kalimantan Farid Wadjdy, Bupati Kukar Rita Widyasari and President Director and GM of Total E & P Indonesie Elizabeth Proust.

According to Proust, an investment issued by Total and Inpex for projects which opened at U.S. $ 4.21 billion, or around Rp 38 trillion. "Until 2017, we plan to continue to invest U.S. $ 16.500 billion (USD 148 billion) in the Mahakam PSC. After 2017, to maintain production, required an additional investment of U.S. $ 7 billion (Rp 60 trillion), "he said.

Proust said, the projects of low pressure gas in Tunu and PECIKO Master Theses will be able to encourage the production of gas at low pressure as much as 1900 mmscfd of total gas production total of 2,500 mmscfd.

PECIKO Master Theses Tunu field and this has been in operation several years ago. Tunu field production started in 1990. The development phase of 11 (Tunu 11) consists of the installation of compression facilities Low Presure (LP) in the South and Tunu Tunu North. 2011 Tunu Production began in late 2009.

Tunu phase 12 (Tunu 12) consists of three GTS construction and well head in a modular platform that is connected to production facilities and test headers. Third GTS ready to be drilled in 2009. While Tunu 13 is the addition of 2 GTS with a similar design Tunu 12.

While PECIKO Master Theses start production in late 1990. PECIKO Master Theses development phase 6 (PECIKO Master Theses 6) which was inaugurated Minister of Energy and Mineral Resources is the development of LP and installation of compression facilities well head platform modification 6 in Field PECIKO Master Theses from the Mahakam block. (Energy and mineral resources)




 
Banner

Whos Online

We have 59 guests online

Position

Home News Oil & Gas Total disbursed U.S. $ 4.21 Billion for New Projects Mahakam block


Countries

28.6%United States United States
26.7%Indonesia Indonesia
14.1%Australia Australia
5.2%Singapore Singapore
3.8%Israel Israel
3.1%Canada Canada
3.1%Japan Japan
2.3%India India
1.7%United Kingdom United Kingdom



JoomlaWatch Stats 1.2.9 by Matej Koval
English Arabic Chinese (Traditional) French German Hindi Indonesian Italian Japanese Portuguese Russian Spanish

Banner

Trusted Partner

Banner